The correct installation method of closed cooling tower

Author:Trlon  Views:  Time:2021-03-11
The correct installation method of closed cooling tower

  Closed cooling towers are very common in specific applications. If such a cooling tower is really to be assembled, it will also have a large number of assembly processes during the assembly process.4uQCooling tower noise reduction treatment manufacturer

  1. Check the bottom4uQCooling tower noise reduction treatment manufacturer

  In the process of specific assembly of closed cooling towers, you must check the equipment at the bottom to see if they meet the requirements of the construction drawings, and you need to see if they can assemble on the same level. Most of the difference in assembly height is about one millimeter, and most of the difference in the middle distance is about two millimeters. Do not use an open flame during the assembly process of the equipment. If necessary, be sure to use electric welding to do it. Do the corresponding safety protection operations.4uQCooling tower noise reduction treatment manufacturer

  2. When the closed cooling tower is assembled, it must be welded immediately on the ground by the feet or on some other ground.4uQCooling tower noise reduction treatment manufacturer

  3. After corresponding inspections, when the closed cooling tower is assembled, it must be ensured that they are all assembled on the same horizontal surface. The middle water inlet pipe must be placed on the agricultural land, and the same water inlet must be adjusted. Orientation, and in the case of assembly, the assembly must be carried out through the lower feet or the tower body and the material support frame filled with it. In the case of assembly, it is also necessary to carry out maintenance and climbing operations and the situation of assembly. Next, consider the water dissipation support frame or some other water collectors. When assembling the closed cooling tower, consider a large number of equipment fans, and even consider some fixed bolts, or Some other air inlet walls are fixed firmly with bolts, so that a large amount of equipment can be secured.4uQCooling tower noise reduction treatment manufacturer

  4. After the closed cooling tower is assembled, it can operate normally.4uQCooling tower noise reduction treatment manufacturer

  The above is about the assembly process of correctly assembling closed cooling towers. I hope that you can have a lot of mastery of closed cooling towers. If you still want to master a lot of information on the selection of closed cooling towers, you are welcome to go to Guangdong Trlonct air-conditioning network (http://www.trlonct.com) to carry out the control.4uQCooling tower noise reduction treatment manufacturer

Article Address:https://www.trlen.com/baike/341.html

News

Contact

Guangdong Trlon Energy-saving Air Conditioning Equipment Co., Ltd.

Contact:Mr. Wang

Free Hotline:4008-8383-95

Company Email:sales@trlon.com

Web Site:https://www.trlen.com/

Company Address: 1916A, Block A, David Donglong Business Building, Longhua, Longhua District, Shenzhen

Trlon WechatClose
alibaba