Trlon air conditioner manufacturers have silent cooling towers, closed cooling towers and cooling tower noise reduction, maintenance and transformation services.
National Service Hotline National Service Hotline:

4008-8383-95

Your current location:HOME > News > FAQ

FAQ

How to choose and install the safety valve and pipeline configuration of the cooling tower?

Author:Trlon  Views:  Time:2021-01-29
How to choose and install the safety valve and pipeline configuration of the cooling tower?

  The editor of trlon air conditioner wants to tell you something about the cooling tower, mainly from the selection of the high-pressure safety valve of the cooling tower and the equipment equipped with the cooling tower pipeline. I also hope that the editor’s explanation will let you Further control the cooling tower.996Cooling tower noise reduction treatment manufacturer

  When selecting a high-pressure safety valve for a cooling tower, the main situation is its discharge volume, that is, the discharge volume of the commonly used high-pressure safety valve for cooling tower equipment must exceed its safe discharge volume. Only in this way can the high pressure be guaranteed when the container is overpressured. After the safety valve is opened, the air can be discharged early to prevent the pressure in the container from rising continuously.996Cooling tower noise reduction treatment manufacturer

  Pay attention to the pressure range of the high-pressure safety valve, because each high-pressure safety valve has a corresponding pressure range at work. It is not allowed to unload the high-pressure spring-type high-pressure safety valve for high-pressure use as a low-pressure vessel, or use the low-pressure high-pressure safety valve for high-pressure tower equipment. The selection should be based on the tower equipment The working pressure adopts the same grade spring leaf. The process conditions of the cooling tower equipment and the characteristics of the operating medium should be considered. For general tower equipment, spring-type high-pressure safety valves should be selected. For tower equipment with low pressure and no vibration, lever-type high-pressure safety valves can be used. If there is toxic, flammable, explosive air in the operating medium of tower equipment, or other air polluting the atmosphere, a closed high-pressure safety valve should be selected.996Cooling tower noise reduction treatment manufacturer

  Piping equipment for cold water tower installation

  (1) The piping between refrigeration equipment and FRP cooling tower (cold water tower) is usually carried out according to the piping configuration diagram. In addition, please refer to the manual of refrigeration equipment and other machines.996Cooling tower noise reduction treatment manufacturer

  (2) In addition to opening the circulating water inlet, the connection of flanges and pipelines should be carried out according to the S311 specification P=9.8×106Pa.996Cooling tower noise reduction treatment manufacturer

  (3) The suction part of the circulating water pump should be set to be smaller than the part of the water pan of the glass fiber reinforced plastic cooling tower (cold water tower).996Cooling tower noise reduction treatment manufacturer

  (4) The pipeline rack should be set so that the FRP cooling tower (cold water tower) does not bear the net weight of the pipeline.996Cooling tower noise reduction treatment manufacturer

  (5) When there are many water distribution tanks, the butterfly valve should be set at the input port of each water distribution tank.996Cooling tower noise reduction treatment manufacturer

  (6) A support stand should be set for the water supply pipe near the FRP cooling tower (cold water tower).996Cooling tower noise reduction treatment manufacturer

Article Address:https://www.trlen.com/baike/304.html

News

Contact

Guangdong Trlon Energy-saving Air Conditioning Equipment Co., Ltd.

Contact:Mr. Wang

Free Hotline:4008-8383-95

Company Email:sales@trlon.com

Web Site:https://www.trlen.com/

Company Address: 1916A, Block A, David Donglong Business Building, Longhua, Longhua District, Shenzhen

Trlon WechatClose
alibaba