Trlon air conditioner manufacturers have silent cooling towers, closed cooling towers and cooling tower noise reduction, maintenance and transformation services.
National Service Hotline National Service Hotline:

4008-8383-95

Your current location:HOME > News > Industry News

Industry News

Preparation before installation of cooling tower

Author:  Views:  Time:2025-10-29
Preparation before installation of cooling tower

  Preparation before installation of cooling towerQnUCooling tower noise reduction treatment manufacturer

  1、 Preparation before installationQnUCooling tower noise reduction treatment manufacturer

  1. Before unboxing the electric motor, check whether the packaging is intact and undamaged, and whether there are any signs of moisture.QnUCooling tower noise reduction treatment manufacturer

  2. Check if the nameplate data of the motor meets the requirements.QnUCooling tower noise reduction treatment manufacturer

  3. Carefully inspect the motor for any deformation or damage during transportation, and check for loose or detached fasteners.QnUCooling tower noise reduction treatment manufacturer

  4. Measure the insulation resistance with a megohmmeter, and the value should not be less than 0.5 megohms. Otherwise, the stator winding should be dried, and the temperature during drying should not exceed 120 ℃.QnUCooling tower noise reduction treatment manufacturer

  1. When installing the product, the shell or bracket should have sufficient strength and rigidity, and the four feet should be leveled and kept horizontal before being tightened.QnUCooling tower noise reduction treatment manufacturer

  2. The hub of the fan should be well matched with the output shaft of the reducer, and the nut should be tightened.QnUCooling tower noise reduction treatment manufacturer

  3. After installation, the fan should be adjusted to the optimal state to ensure smooth operation.QnUCooling tower noise reduction treatment manufacturer

  4. The fan blades should be turned flexibly.QnUCooling tower noise reduction treatment manufacturer

  1. The shell or bracket of the product should have sufficient strength and rigidity during installation, and the four feet should be leveled and kept horizontal before being tightened.QnUCooling tower noise reduction treatment manufacturer

  2. The hub of the fan should be well matched with the output shaft of the reducer, and the nut should be tightened.QnUCooling tower noise reduction treatment manufacturer

  3. After installation, the fan should be adjusted to the optimal state to ensure smooth operation.QnUCooling tower noise reduction treatment manufacturer

  4. The fan blades should rotate flexibly.QnUCooling tower noise reduction treatment manufacturer

  5. Adjust the tightness of the beltQnUCooling tower noise reduction treatment manufacturer

Article Address:https://www.trlen.com/news/757.html

News

Contact

Guangdong Trlon Energy-saving Air Conditioning Equipment Co., Ltd.

Contact:Mr. Wang

Free Hotline:4008-8383-95

Company Email:sales@trlon.com

Web Site:https://www.trlen.com/

Company Address: 1916A, Block A, David Donglong Business Building, Longhua, Longhua District, Shenzhen

Trlon WechatClose
alibaba